For effective production management, it is also necessary to have suitable tools for optimizing production and planning it. The EasyTechnology information system has a modular concept, the Planning module is also available. Considering the different types of production and the requirements of the system users, two different production planning modules are supplied. According to the nature of their use, they can be distinguished as Automatic or Manual.

Scheduling module properties

The Planning module allows you to easily and quickly plan the production of orders - entire machines and equipment, groups or individual parts into the existing production plan, in such a way as to make maximum use of the capacity of the production equipment and workplaces. It allows you to create several plan variants and choose the most advantageous one for the company. It will help you easily identify critical production points, suggest possible solutions and their further impact on other production systems and workplaces. The Planning system allows you to promptly respond to operational influences in production, such as planned machine repairs, equipment failures, holidays and other absences of production workers, as well as delays in the delivery of materials or components from cooperation. You can always quickly find out whether a new order "fits" into your plan, whether you can confirm it, or deal with either deadlines or capacities, for example, in the cooperation of certain operations or parts.

Benefits of the planning module:

  • An overview of the capacity requirements of individual orders,
  • accurate information about the workload of individual machines and workplaces, finding bottlenecks
  • a realistic display of the fulfillment of the plan according to the current work write-offs,
  • shortening lead times and increasing productivity,
  • the ability to assess the impact of required changes in the plan on individual orders
  • optimization of production with regard to operational influences.

The input requirements for the planning function are the technological procedure and the system of production transfer. This is not possible without a technological procedure, which is why even planning retrieves information from individual operations. Each operation has a designated machine or workplace including preparation and machine time. Entire jobs are loaded into planning. The display of the plan itself is divided into individual machines or workplaces. In order for the plan display to be correct, information about the production output is also necessary, i.e. the depreciation of individual workers, which degrades the necessary time to complete the operation. In the case of adding the MES module with machine monitoring, you also have ongoing information about production in Planning with regard to real operating parameters and the workload of machines and lines.

The system plans to unlimited resources. Selecting the job you need to add to the schedule is done manually. Individual operations are subsequently added to defined workplaces according to the term of the position or order. The system displays the individual operations of the order's products, where each workplace has a defined display color, the start and end date of the operation, the total time and other parameters are also displayed. If you need to move an appointment within the same workplace, you can use the drag and drop function to move it to another appointment. The user has the option of displaying by operations, positions and/or overall orders. At the same time, the system displays an overview of workplaces (machines) and percentage utilization for individual days. The entire plan is based on a capacity calendar, where it is possible to define the peak time in hours for individual days. This planning method displays overloaded capacity by highlighting the day in color in the workplace overview.

Manual scheduling is suitable for companies that prefer to customize the schedule, i.e. by moving operations to other days or to another location so that individual workplaces are not overloaded.

Automatic scheduling

Automatic scheduling uses a resource-constrained scheduling system. After jobs are added to the schedule, automatic scheduling starts. Individual operations are added to the workplace in such a way that there is no overloading of the workplace and at the same time the sequence of the sequence of individual operations is observed. If the entry parameters are not met, the operation that does not meet the specified deadline is highlighted in red. Moving the operation to another workplace or another date requires manual adjustment with the possibility of fixing the given date. After saving, not only the given operation, but also subsequent operations will be automatically rescheduled.

Automatic planning is suitable for companies that have a larger volume of manufactured parts with minimal corrections in moving dates and need to have an overview of the actual dates of the end of production according to the planned operations.

Planning for your business

Our technical consultants will recommend a suitable planning system for your company, and based on your requirements and needs, they will choose a suitable variant of the Planning module.

By submitting this form, you agree to the processing of personal data.

© 2026 TD-IS, s.r.o. all rights reserved.

 

 

Translate »